A commercial property in Raleigh needs more than a boundary line. Warehouses, distribution centers, and multi-tenant industrial sites rely on commercial perimeter fencing to keep out unauthorized visitors, but the perimeter still has to let employees, delivery trucks, and service vehicles through dozens of times a day. That raises a practical question for any facility manager planning a new perimeter fence installation: can the same chain link perimeter include an automated gate?
Yes, Chain Link Perimeters Can Include Automated Gates

Automated gates are a standard upgrade on commercial perimeter fencing, not a specialty add-on that requires a different fence system. A gate operator mounts directly to the existing chain link posts and gate frame, using the same line that runs along the rest of the perimeter. Because the operator integrates with the fence’s existing structure, adding automation is a decision made at the time of a new installation or upgrade, planned around the site’s traffic and access needs.
Every chain link fence we install in Raleigh, whether galvanized, vinyl-coated, slatted, or security-grade, carries a lifetime manufacturer’s material warranty, regardless of whether a section eventually gets an automated gate. For the full range of options, see our commercial fencing services in Raleigh.
Why Commercial Perimeters Need Controlled Access Points

A fence line is only as secure as its access points. For facility managers, that means the gate matters as much as the fencing itself.
Uncontrolled access at a commercial property creates real exposure. Anyone who can walk or drive through an open or unmonitored gate has effectively bypassed the rest of the perimeter, whether that’s a trespasser after scrap metal and copper wire or a vehicle with no business on-site after hours. Employees need a way in that doesn’t require a staffed post at every entrance, and delivery drivers need a controlled way to reach a loading dock without a manager having to walk out to unlock a chain each time a truck arrives.
Liability adds another layer, since a property that can’t show it controls who enters is in a harder position to defend if an incident occurs on-site, particularly at industrial or multi-tenant sites, where several businesses share one perimeter. An automated gate turns that single weak point into a managed one. For the surrounding fence line itself, see our perimeter fencing options for your property.
Choosing Between Slide and Swing Gates

Not every site can accommodate both gate types, so the choice usually comes down to the property itself.
Site Factors That Decide Slide vs. Swing
A swing gate needs enough clearance for its full arc to open without hitting parked vehicles, dumpsters, or a slope in the pavement, which rules it out on many tighter commercial lots where the drive aisle sits close to the building or an opposite fence line. Grade matters too. A swing gate mounted at the bottom of a slope can drag or bind as it opens, while a slide gate travels along a track parallel to the fence line and tolerates grade changes more easily.
Traffic volume is the other deciding factor. Warehouse and industrial sites in Raleigh with frequent truck traffic generally do better with a slide gate, since it opens and closes faster and doesn’t need the setback distance a swing gate requires to clear the drive lane. Space-constrained sites, including narrow loading areas or lots with limited street frontage, tend to default to slide gates for the same reason.
Sites with more open frontage and lower daily traffic can often support either type. Whichever configuration fits, the gate installs alongside the same commercial chain link installation process used for the rest of the perimeter.
Access Control Methods for Automated Gates

Once the gate type is settled, the next question is how people actually get through it. Several access control methods work with automated commercial gates on Raleigh properties:
- Keypad entry: A programmable code lets employees and regular vendors in without a key or card, and codes can be changed if staff turnover requires it.
- Card or fob readers: Each credential can be tracked and deactivated individually, suiting sites with a larger or rotating workforce.
- Phone or app-based entry: Authorized users trigger the gate remotely, useful for deliveries or one-time visitor access.
- Staffed guard override: On sites with a guard shack, staff can open the gate manually as a backup to any automated method.
Whichever method a property uses, the access control system has to work alongside the gate operator’s built-in safety features, not around them. That’s where entrapment-protection standards come in.
Safety Standards for Automated Gate Operators

UL 325 and Entrapment Protection Requirements
Automated gate operators on commercial properties in Raleigh are subject to the UL 325 gate operator safety standard, which sets entrapment-protection requirements for vehicular gate operators. The standard requires at least one independent primary and one independent secondary means of entrapment protection for each direction the gate travels, so a gate can’t rely on a single safety mechanism.
If one system fails to detect an obstruction, a second, independent system must still detect it before the gate can cause harm.
ASTM F2200 and Commercial Gate Classifications
ASTM’s automated gate construction standard ASTM F2200 covers the construction of horizontal slide, horizontal swing, vertical lift, and vertical pivot gates. It also sorts gates into four use classes: Class I for residential sites, Class II for commercial properties such as multi-family housing, hotels, retail, and other public-serving locations, Class III for industrial sites like factories and loading docks, and Class IV for restricted-access industrial properties. Most commercial gate projects in Raleigh fall into Class II or Class III, depending on how much public traffic the site sees versus controlled industrial access.
Every automated gate we install in Raleigh is built to meet both UL 325 and ASTM F2200, regardless of the gate configuration, and the chain link itself still carries its lifetime manufacturer material warranty no matter which gate it supports.
Considering an automated gate for your commercial property? Book A Free Consultation or call now: (919) 900-7225.
Raleigh Code and Permit Considerations for Commercial Gates

Any automated gate added to a commercial perimeter in Raleigh must also comply with the city’s fence and gate rules, which go beyond a simple height limit.
Raleigh’s Unified Development Ordinance addresses fence height directly in Raleigh’s fence and wall ordinance, Sec. 7.2.8. Front and side-street setback fences are capped at 6.5 ft, with any portion above 4 ft limited to 50 percent opacity. Side and rear setback fences can go up to 8 ft, or 6.5 ft if adjacent to a street, and a continuous fence or wall plane is capped at 100 ft before the design needs a break. Chain link fencing is prohibited in front and side-street setbacks citywide, with one exception: properties zoned Industrial Heavy (IH) are explicitly allowed to use chain link there, a distinction that matters for industrial sites planning a gated commercial fence-and-gate project in that zoning category.
Height isn’t the only trigger. A commercial fence taller than 6 ft may require a building permit in addition to the standard zoning permit, and commercial applicants should use the Non-Residential Permit Application, routed to Commercialbuilding@raleighnc.gov. Corner lots, multi-frontage properties, and fences near a street also get reviewed against the Raleigh Street Design Manual, and permit fees for commercial projects differ from the residential fee structure and should be confirmed directly with the city rather than assumed. If budgeting for permit costs alongside the project itself feels like a lot to plan for at once, our financing options for your project can help spread out the cost.
Utility locates through NC811 generally take 3 to 12 working days and remain valid for 28 days from the ticket’s work start date. The city’s own review benchmark is roughly three business days, though that’s a goal rather than a guarantee, and gated commercial entries should be confirmed with Raleigh Fire and Development Services before finalizing placement. See commercial fence permit requirements for the current process.
Secure Your Commercial Perimeter With a Custom Gate Plan
A secure commercial perimeter fencing project pairs the fence line with a gate that fits how the property actually operates. Whether you need a new slide gate for a Raleigh warehouse or a swing gate for a smaller commercial lot, we plan the gate and the perimeter together from the start. Not all fences are created equal, ours are just better.
Book A Free Consultation or call now at (919) 900-7225. Ready to talk through your site? Request a free commercial quote and we’ll help plan a gate that fits your Raleigh property.
Frequently Asked Questions
Can a chain link fence really support an automated gate?
Yes. A gate operator mounts to the existing chain link posts and gate frame, integrating with the fence line already in place. Adding a gate is planned as part of a new installation or upgrade, not treated as separate hardware bolted onto an unrelated fence.
What access control options work best for a commercial gate?
It depends on the site. Keypad entry and card or fob readers suit a stable workforce, phone or app-based entry works well for deliveries and visitors, and a staffed guard override gives larger sites a manual backup.
Do automated commercial gates need a permit in Raleigh?
Fences over 6 ft may require a building permit in addition to the standard zoning permit, and commercial applicants use Raleigh’s Non-Residential Permit Application. Permit fees for commercial projects differ from residential fees and should be confirmed directly with the city.
What safety standards apply to automated gate operators?
Commercial gate operators are built to meet UL 325’s entrapment-protection requirements and ASTM F2200’s construction and use-class standards, which cover everything from multi-family and retail properties to industrial sites.
Should I choose a slide gate or a swing gate for my site?
It comes down to the property. Swing gates need clearance for their full arc and can struggle on sloped or tight sites, while slide gates run along a track and generally suit higher-traffic or space-constrained lots better.